Try QuoteGPT
Chat naturally about what you need. Each answer links back to real quotes with citations.
" "The consequences of the actions by this Government are the following; Damage to motor vehicle engines by the users of these products in due course because the hydro cracker is not able to pick out all the acidity from the products that will come out of that crude oil. They will not be able to treat it fully and remove all the impurities.
Edith Zewelani Nawakwi (24 June 1959 – 7 April 2025) was a Zambian politician and economist by profession. She was the first woman in Zambia to hold the post of Minister of Finance following her appointment in 1998. She was also the first woman to hold that post in the SADC region. She was the President of the Forum for Democracy and Development under which she ran for president at the 2016 general election.
Try QuoteGPT
Chat naturally about what you need. Each answer links back to real quotes with citations.
Related quotes. More quotes will automatically load as you scroll down, or you can use the load more buttons.
This smacks of the deepest scam were our people have put money in their pockets and left the country to be injured. In another country the Minister of Energy and all involved would have been fired by now that is why am saying that this should be led on the door step of the Minister of Defence (the President). He is aware of what has happened, they are shrouding it in ‘we are investigating’ what is there to investigate? All of us have the reports and we all know what is happening at indeni.
Works in ChatGPT, Claude, or Any AI
Add semantic quote search to your AI assistant via MCP. One command setup.
The third problem is that the hydro cracker is not able to take products which are contaminated. It will burn and you will find that Indeni has to shut down every week to prevent the hydro cracker from burning, even the pipes through which they are pumping this contaminated oil will begin to corrode so they have to continuously replace them or clean them. Ideally they should run uninterrupted for 3 months or 6 months if they have done prementenace work.