Flow means that inventories in the operation are moving. When inventory is not moving, inventory accumulates. Accumulation of inventory takes up spac… - Eliyahu M. Goldratt

" "

Flow means that inventories in the operation are moving. When inventory is not moving, inventory accumulates. Accumulation of inventory takes up space. Therefore, an intuitive way to achieve better flow is to limit the space allowed for inventory to accumulate. To achieve better flow, Ford limited the space allotted for work-in-process between each two work centers.

English
Collect this quote

About Eliyahu M. Goldratt

Eliyahu Moshe Goldratt (March 31, 1947 – June 11, 2011) was an Israeli physicist who became a business management guru

Biography information from Wikiquote

Also Known As

Native Name: אליהו גולדרט
Alternative Names: Eliyahu Goldratt Eliyahu Moshe Goldratt
Unlimited Quote Collections

Organize your favorite quotes without limits. Create themed collections for every occasion with Premium.

Related quotes. More quotes will automatically load as you scroll down, or you can use the load more buttons.

Additional quotes by Eliyahu M. Goldratt

In summary, both Ford and Ohno followed four concepts (from now on we’ll refer to them as the concepts of flow): Improving flow (or equivalently lead time) is a primary objective of operations. This primary objective should be translated into a practical mechanism that guides the operation when not to produce (preventsoverproduction). Ford used space; Ohno used inventory. Local efficiencies must be abolished. A focusing process to balance flow must be in place. Ford used direct observation. Ohno used the gradual reduction of the number of containers and then gradual reduction of parts per container.

Go Premium

Support Quotewise while enjoying an ad-free experience and premium features.

View Plans
Look, we give sales a rigid lead time for each product. So if it’s not in finished goods, those are the numbers they should use to promise to clients. Yeah, they deviate from it, but not by much. Maybe there should be another way. Maybe the quoted lead times should be done case by case, according to the load on the bottlenecks. And maybe we shouldn’t regard the quantities required as if we have to supply them in one shot.

Loading...